KNOW THE SOURCE
Cost the material selected by the plan.
A result identifies the full stock or remnant assigned to requested parts. This creates a concrete material basis instead of applying one blended estimate to every possible layout.
- Physical source assignment
- Material quantity consumed
- Stock-specific cost basis
- Multiple source candidates considered
